Machine park, inspection and quality system

7 machining centres, 2 CNC lathes, a temperature-controlled inspection room and documents that ship with every delivery. No adjectives, just the inventory.

DEA coordinate measuring machine in the temperature-controlled measuring room

Inspection room 21–22 °C

DEA 9.15.8 CMM

Inventory

Machine park

MachineQty
HAAS UMC-750 5-axis machining centre 2
HAAS UMC-500 5-axis machining centre 2
DMG MORI DMU 60 eVo 5-axis machining centre 1
Doosan DNM 6700 3-axis machining centre 1
HAAS VF-3 SS 3-axis machining centre 1
HAAS ST-10Y CNC lathe (Y axis, live tooling) 2
DEA 9.15.8 CMM Coordinate measuring machine 1

Total: 7 machining centres (5 of them 5-axis), 2 CNC lathes, 1 CMM

HAAS UMC-750 5-axis machining centre

7 machining centres, 2 CNC lathes

5 of them 5-axis, three shifts

Materials

Aluminium alloys, carbon steels, stainless steels, titanium, brass, copper. Traceability through material certificates.

We do not machine plastics (POM, PEEK etc.). Plastic components supplied by the customer or made by an approved supplier are assembled with our metal parts in-house and delivered complete.

Surface treatment and assembly

Anodising, plating and painting are carried out by our approved suppliers under our responsibility and guarantee; incoming inspection is done in-house. Assembly is done in our own facility by our own team. The customer receives a complete part from a single source.

Inspection and quality control

Every batch is measured on the CMM. First article inspection (FAI), the PPAP file and, where requested, per-part measurement reports ship with the delivery. The inspection room is air-conditioned and held at 21–22 °C.

Commitment

Quality policy

At TRK Makina Mühendislik we commit to:

  1. 1meeting our customers’ expectations and requirements in full, in every batch,
  2. 2continuously improving our processes in line with current developments,
  3. 3complying with environmental and occupational health and safety laws and regulations.

Mustafa TÜRKGeneral Manager

Documents

  • ISO 9001 quality management system
  • First article inspection (FAI)
  • PPAP file
  • Per-part measurement report
  • Material certificate

Send us your drawing, we’ll come back with a quote.